tailrace

['teɪlˌreɪs]['teɪlreɪs]

n.(水轮,涡轮的)放水路

  • Type selection of tailrace surge chamber of Longtan Hydropower Station

    龙滩水电站 调压室形式选择

  • The results provide the theoretical basis and design guidance for the application of tailrace tunnel ventilation system in hydropower station .

    这些结果为水电站 压尾 水洞 风系统的应用提供了理论基础与设计依据。

  • Effective Ventilating Length of Tailrace Tunnel in Hydropower Stations

    水电站 压尾 水洞 有效作用长度

  • Characteristics of Heat and Moisture Transfer of Tailrace Tunnel Ventilation in Hydropower Station

    水电站 压尾 水洞 过程的热湿交换特性

  • Experimental Investigation of the Cooling Performance of Tailrace Tunnel Ventilation in Hydropower Stations ; Performance Test and Internal Flow Field Analysis of Pressure Reducing / Sustaining Valve for High-pressure Water Supply

    水电站 压尾 水洞 风换热试验研究高压供水减压稳压阀的性能试验与内流场分析

  • Experimental Study on Expansive Soil of Spillway Tailrace in Yanshan Reservoir

    燕山水库溢洪道 水渠膨胀土试验研究

  • There-fore the design of the tailrace system is reasonable .

    最低涌浪水位高于设计所要求的最低涌浪水位,说明该 系统的设计是合理的。

  • Practice of hoisting technique for tailrace sluice gate of the power house of hydropower station

    水电站 厂房 水闸门吊装技术实践

  • Experimental Investigation of the Cooling Effect of Tailrace Tunnel Ventilation Process in Hydropower Stations

    水电站 压尾 水洞 风降温效应模型试验研究

  • Numerical Analysis of Excavation Process for Tailrace Tunnels of Pengshui Project

    彭水电站 水洞施工开挖过程数值分析

  • The method is adopted in the tail-race system dynamic simulation calculation of Baise hydropower station and the tailrace tunnel shape is optimized so the satisfying result is worked out .

    将该方法应用于百色水电站的尾水系统动态仿真计算中,并对 隧洞洞型进行优化,得到了满意的结果。

  • Theoretical Research on Water Flow Movement of Transient Process Caused by Small Fluctuation With Inclined Roof Tailrace Structure

    变顶 系统小波动过渡过程中水流运动理论研究

  • Analysis on tailrace system with varying crown elevation of TGP 's right bank underground power station

    三峡右岸地下电站变顶高 系统分析研究

  • Influence of Simple Tailrace Surge Tank Location on Draft Tube Minimum Pressure

    简单 压室位置对尾水管最小压力值的影响

  • The tailrace surge chamber shared by two units common in hydropower stations with diversion systems has problems of water level fluctuation and hydraulic disturbance .

    双机 压室是水电站引水发电系统中一种常见的布置形式,存在 室水位波动和水力干扰问题。

  • Calculation of hydraulic transients of tailrace system with air chamber

    设置气垫 室的 系统水力过渡过程计算

  • Testing System for Model of Hydropower Station with Inclined Ceiling Tailrace Based on Virtual Instruments

    基于虚拟仪器技术的 水洞 大型水电站模型试验系统

  • Flow regime and head loss of two different tailrace systems in hydropower station were investigated .

    对两种不同的 系统 布置方式进行了流态和水头损失的对比分析。

  • Characteristics of Seepage Field and Stability Analysis for Tailrace Canal Bank on Shawan Hydropower Station of Dadu River

    河水猛冲着岩石堤岸。大渡河沙湾水电站 水渠渠堤渗流场特征及稳定性分析

  • Stable sectional area of tailrace surge tank on complicated tailrace system

    复杂尾水系统的 室稳定断面 推求

  • Numerical Simulation of Hydraulic Turbine and Hydropower Station Tailrace System Based on the Computational Fluid Dynamics

    基于计算流体动力学的水轮机及水电站 系统数值研究

  • Through optimal design one after another the selection of the powerhouse location and axis and the general layout of powerhouse and tailrace tunnel etc. have reached the requirements of optimization and reasonableness .

    经过一步步优化设计,使厂房位置和轴线的选择,厂房枢纽的布置, 系统的布置等,均达到了优化、合理的要求。

  • On the basis of calculating seepage field stability analysis for tailrace canal bank is carried out . The stability coefficient of tailrace canal bank under different conditions is calculated and the results of calculation are evaluated .

    在渗流场计算的基础上,进行了 水渠渠堤稳定性分析,得出了不同工况下尾水渠渠堤的稳定性系数,并对稳定性作出评价。

  • Analysis of Draft Tube Vibration Induced by Tailrace Eddy based on A Fluid-Structure Coupling Numerical Method

    基于流固耦合数值方法的 水涡 诱发尾水管振动分析

  • Chapter 3 : Present the theory of the analysis of stability and computation on regulation process to the system of hydropower station with surge tank of many units sharing in one tailrace tunnel .

    第3章,阐述了多机一 水电站水力调速系统的稳定分析和调节过程计算理论。

  • Study for Development Method and Hydraulic Characteristics of Long Tailrace on Shawan Hydropower Station of Dadu River

    大渡河沙湾水电站开发方式及其 长尾 水渠水力学特性研究

  • Research shows that the results have guiding significance and reference significance for analyzing and designing similar tailrace of hydropower station .

    研究证明,其成果对于同类水电站 水渠的分析及设计具有一定的指导和借鉴意义。

  • Analysis Method on Excavation and Lining Structure for Large-span Tailrace Bifurcation Tunnel

    大跨径 岔洞开挖与衬砌稳定分析方法研究

  • By analysis of test for model of hydropower station with inclined ceiling tailrace an online data acquisition data analysis and control method availing to virtual instruments is designed .

    通过对 水洞 大型水电站模型试验的分析,设计了一种用虚拟仪器技术,实现在线数据采集、数据分析和控制的方法。

  • Model experiment for tailrace tunnel of hydropower station has been conducted and the results of this method agree with the experiment very well .

    通过某电站 隧洞 水力学模型实验 专门对该方法进行验证,表明该计算方法是正确的。