TSQ

[化] 三节四极质谱仪

  • The Role of Consulting Services in the Construction of TSQ - 1 Project

    咨询活动在 天生 水电 建设中发挥的作用

  • This article gives a presentation on the construction condition and peculiarities of con-crete-faced rockfill dam of TSQ - ⅰ Project . Ideas on river flow control plan selection of alter-natives design principle and construction scheduling for concrete-faced rockfill dam are also dis-cussed .

    本文介绍了 天生 水电站面板堆石坝的建设条件和特点,河道水流控制的规划思想、方案比较选择、设计原则,和面板堆石坝施工程序安排。

  • Reformation of Protection against Lightning for the Safety Monitoring Automation System for Diversion Tunnel in TSQ ⅱ Hydropower Station

    天生 Ⅱ级水电站引水隧洞安全监测系统防雷改造

  • Based on the investment construction and supervision of TSQ - ⅰ HydroelectricProject the TSQ - ⅰ Project payment settlement management system was developed .

    天生 水电 工程结算月报表管理系统主要是根据天生桥一级水电站的工程投资、工程施工以及 长委会监理部对工程进行全面监理的实际情况出发编制开发而成的。

  • High slope design in the power house area of TSQ ──ⅰ Hydropower Project

    天生 水电 厂区高边坡设计

  • River water flow control and construction program planning of concrete-face rock fill dam for TSQ - ⅰ Hydropower Project

    天生 水电 河道水流控制与面板堆石坝施工程序规划

  • Analysis of Settlement Payment of Lot C_3 for TSQ - ⅰ Hydropower Station

    天生 水电站C3标 工程结算支付分析

  • The construction of TSQ I dam paid attention to the following links : Strict quality management and strict quality control is the key to project construction success ;

    天生 大坝建设中,重点抓住了以下环节:严格的质量管理和严格的质量控制是工程建设成功的关键;

  • Presentation on the primary circuit design in the bidding design stage for TSQ - ⅰ Hydropower Project

    天生 水电 招标设计阶段电工 次设计介绍

  • Reminiscences of Construction for TSQ - 1 Hydropower Project

    天生 水电 建设 回顾

  • Consolidation Grouting Construction of Spillway Flip-bucket for TSQ - 1 Hydropower Station

    天生 水电站溢洪道挑流鼻坎固结灌浆施工

  • During the construction of TSQ ⅰ CFRD some problems including the separation of deck from the cushion on the top of phase ⅰ and phase ⅱ decks cracking of the slope face of cushion and partial deck occurred .

    天生 水电 混凝土面板堆石坝的施工中,发生了一、二期面板顶部脱空、上游垫层坡面开裂和面板局部裂缝问题。

  • The briefing on design work of Danjiangkou dam heightening and several key techniques concerned are described . Current status of utilizing foreign currency for TSQ - ⅰ Hydropower Project

    介绍了丹江口大坝加高设计工作简况、特点及加高设计中几个关键技术问题的 处理 措施天生 水电 利用外资进行的工作简况

  • The Fault Analysis and Improvement Suggestion on DC Filter Capacitor at Converter Station of TSQ

    天生 换流站直流滤波电容器故障原因分析及改进建议