tube bridge

[tub brɪdʒ][tju:b bridʒ]

[电] 管电桥

  • Technical Dispositions in Design of Three span Continuous Half through Concrete filled Steel tube Arch Bridge

    三跨自锚中承式 钢管混凝土 拱桥设计中的技术处理

  • Many experts and scholars in China are concentrating on of the concrete-filled steel tube arch bridge static characteristic and dynamic analysis .

    我国很多专家学者正如火如荼的对 钢管混凝土 拱桥的静力特性和动力特性进行研究分析。

  • Using the finite element method this paper computed and analyzed the stability of cable-stayed concrete filled steel tube arch bridge .

    采用有限元法分析了横撑对斜拉 钢管混凝土 拱桥整体稳定性的影响。

  • The Anti-seismic Analysis on Concrete-filled Steel Tube Tied-arch Bridge Basing on the Finite Element Method

    钢管混凝土系杆 拱桥的有限元抗震分析

  • The application of CNG-air mixture adding purge gas used as gas source for peak load adjustment Interaction of steel pipe and concrete in concrete-filled steel tube arch bridge

    CNG混空气掺混弛放气作为调峰气源的应用 钢管混凝土 拱桥中钢管与混凝土相互作用问题

  • Design and Analysis of Test Model of Double-Deck Concrete-Filled Steel Tube Arch Bridge

    双层桥面 钢管混凝土 拱桥试验模型设计及理论分析

  • A System of Safety Evaluation for Concrete-Filled Steel Tube Arch Bridge Based on GIS

    基于GIS的 钢管混凝土 拱桥安全性评价系统

  • Research on Mechanical Properties of Oblique-Crossing Annular Plane of Concrete-Filled Steel Tube Obique bridge is made up of main girder crossbeam and bridge floorings .

    钢管混凝土柱斜交环板受力性能研究斜交 由相互斜交的主梁、梁及桥面板组成,结构受力复杂。

  • As a long-span bridges concrete-filled steel tube arch bridge structure is a more satisfactory form .

    作为大跨径桥梁, 钢管拱桥是较为理想的结构形式。

  • Design and Construction of Concrete-filled Steel Tube Arch Bridge over Suzhou Creek

    上海轨道交通3号线跨苏州河 钢管混凝土 拱桥设计与施工

  • Wushan Changjiang River Bridge is a half-through concrete-filled steel tube arch bridge .

    巫山长江大桥是一座中承式 钢管混凝土 拱桥

  • Safety Evaluation of Concrete Filled Steel Tube Arch Bridge Based on Radial Basis Function Neural Network

    基于径向基网络的 钢管混凝土 拱桥安全性评价方法

  • Seismic Response Analysis of Concrete Filled Steel Tube Arch Bridge under Multi-support Excitation

    多点激励下 钢管混凝土 拱桥的地震反应分析

  • A zonal approach damage identification method is proposed for global identification of the concrete-filled steel tube arch bridge .

    然后针对 钢管混凝土 拱桥 结构特点,提出了分区域的损伤识别方法。

  • In recent years The concrete filled steel tube arch bridge has obtained a rapid development for its full play to the property of both steel and concrete and with good adaptive for construction .

    钢管混凝土 拱桥由于其充分发挥了钢材和混凝土两种材料的性能,并对 桥梁施工方法有良好的适应性,近年来获得了快速发展。

  • Application of Concrete Filled Steel Tube in Bridge Construction

    钢管混凝土结构在 桥梁中的应用

  • Effects of Initial Displacement Imperfection on Ultimate Strength of Concrete Filled Steel Tube Arch Bridge

    初始几何缺陷对 钢管混凝土 拱桥极限承载力的影响

  • In recent years the concrete-filled steel tube arch bridge has been widely used in China .

    近些年, 钢管混凝土 拱桥在我国得到了广泛的应用。

  • Effect of Initial Geometrical Imperfection on Dynamic Stability of Suspen-Domes Effects of Initial Displacement Imperfection on Ultimate Strength of Concrete Filled Steel Tube Arch Bridge

    考虑初始几何缺陷的弦支穹顶结构动力稳定性分析初始几何缺陷对 钢管混凝土 拱桥极限承载力的影响

  • Key Techniques for Construction of Zhijing River Concrete-Filled Steel Tube Arch Bridge

    支井河 钢管混凝土 拱桥施工关键技术

  • This paper presents a method of detecting density of concrete for concrete-filled steel tube arch bridge by ultrasonic wave method through a specific example .

    本文通过一 工程实例具体说明如何采用声波透射法实现对 钢管混凝土 拱桥 混凝土密实性的检测控制。

  • The stability analysis of concrete filled steel tube arch bridge is usually divided into elastic buckling analysis and nonlinear buckling analysis .

    钢管混凝土 拱桥的稳定性分析通常分为弹性屈曲分析和非线性屈曲分析。

  • Construction control of concrete-filled steel tube arch bridge based on forward iteration method

    基于前进迭代法的 钢管混凝土 拱桥施工控制

  • Thus making the diagnosis of concrete filled steel tube bridge diseases and health evaluation is particularly important .

    因此使得对 钢管混凝土 桥梁病害的诊断和健康状况的评定变得尤为重要。

  • Interaction of steel pipe and concrete in concrete-filled steel tube arch bridge

    钢管混凝土 拱桥中钢管与混凝土相互作用问题

  • Existing theory can not fully meet the actual needs of the modern concrete filled steel tube arch bridge design and construction .

    现有分析理论已不能完全适应现代 钢管混凝土 拱桥在设计和施工中的实际需要。

  • Concrete filled steel tube arch bridge is a new technology in the bridge development of China this paper has introduced the loading experiment of middle bearing concrete steel tube filled arch bridge in detail .

    钢管混凝土 拱桥是我国近年来桥梁发展的新技术,笔者详细介绍了松原市中承式钢管混凝土拱桥荷载试验情况。

  • The rapid developments in concrete filled steel tube arch bridge in China have been achieved in the recent years .

    钢管混凝土 拱桥近几年来在我国发展很快。

  • At home and abroad to the experimental study of concrete filled steel tube structure analysis the paper analyzes the relevant steel tube concrete bridge towers model tests .

    对国内外钢管混凝土结构的试验研究进行分析,重点分析有关 钢管混凝土 桥塔的模型试验研究。

  • Lateral brace arrangement for large-span half-through concrete filled steel tube arch bridge

    大跨中承式 钢管混凝土 拱桥的横撑布置